Getting a quote from us is easy

Simply apply online or request a call back. If there's anything you're not sure about, we're here to help - just call us on on 03330 146 466.

Apply for a quote online Request a call back
×

Login


Register

0 results
  • Services
    • Electric Vehicle Charging
  • Sectors
    • Industrial & Commercial Developers

Scope

Located at motor way service stations and delivered to give the user a full charge within 30 minutes for long journeys.

Fulcrum completed the design and installation of the electric infrastructure for this project at six sites nationwide. This included network connections, excavation and civils, high voltage cabling, and the supply and installation of a substation.

Fulcrum ensured that all legal arrangements were in place and that the sites were made operational promptly.

Getting a quote from us is easy

Simply apply online or request a call back. If there's anything you're not sure about, we're here to help - just call us on on 03330 146 466.

Gas Emergencies Gas Emergency?

Call us Call: 0800 111 999

Electricity Emergencies Electricity Emergency?

Call us Call: 105

Chas Gas Safe Register LR GIRS LR NERS LR WIRS Constructionline 2018 RosPa Order of Distinction LR ISO 14001 LR ISO 9001 Gas Industry Awards 2016 Winner