Key Stats

3km
gas pipeline installation
625
lodges, a luxury hotel, self-contained spa suites and retail outlets

Share

Twitter LinkedIn Google Plus Email Print

Customer requirements

Fulcrum was appointed to design and install a 3km pipeline to supply gas to the latest Center Parcs holiday village; Woburn Forest in Bedfordshire.

The new pipeline links Center Parcs’ new £250 million, 362 acre Woburn Forest site to the gas network.

Cenp Warren Wood S3 Street Top Rgb Without Signage Center Parcs5 Small

Our solution

The new installation supplies natural gas to an energy centre that includes combined heat and power units (CHP) and a central biomass boiler, providing energy for the indoor pool and leisure facilities, 625 lodges, a luxury hotel, self-contained Spa Suites and retail outlets. The gas supply will also support hotel laundry facilities and cooking in the many restaurants.

Customer feedback

On award of the contract, Center Parcs Woburn Construction Director, Don Camilleri said:

“Protection of the environment has always been a fundamental guiding principle for Center Parcs and Woburn Forest will be no exception. Center Parcs has a sustainability strategy in place which has been agreed by the local authority and as such, Fulcrum will be providing us with a safe, natural gas connection to support Woburn Forest.”

C2 Main Entrance Center Parcs2 Small

Similar Case Studies
2012 Olympic Stadium & Park

2012 Olympic Stadium & Park

Fulcrum designed and installed some of the Games’ most critical gas infrastructure serving the Olympic Park, Athletes’ Village and the jewel in the crown, the Olympic Cauldron. Read more >>


Birmingham New Street Station

Birmingham New Street Station

Network Rail carried out a £600m transformation of Birmingham New Street Station and Network Rail wanted to ensure gas supplies for heating and cooking were available to the existing and new premises throughout the project. Read more >>


News

Strong performance at Fulcrum as company grows utility asset management base

Fulcrum, the UK’s leading independent multi-utility infrastructure and services provider, has report… Read more >>

© Fulcrum 2017

Designed by dR Agency

Top