Gas Disconnections

Gas Disconnections

Your gas supply will be disconnected by our GIRS accredited and Gas Safe Registered engineers. And if you require, they will also remove the gas meter then purge and remove your outlet pipework (the pipework from the gas meter to the appliances).

Our heritage as part of the Gas Board, Transco and National Grid together with our CHAS, Constructionline and RoSPA* accreditations mean you can rely on us to get the job done correctly and safely.

Gas disconnection without disruption

You don't need to worry if gas disconnection is a key stage within a schedule of works, our response times will allow you to plan the wider works rather than disrupt them.

If disconnection is part of a wider site redevelopment our design and planning services will coordinate everything for you, from disconnection through to installation of a new supply, meter and outlet pipework, speeding up delivery of your project.

Four Week Gas Disconnections

We're committed to delivering an improved customer experience and have introduced a fast gas disconnection solution that helps you plan with confidence and avoid, wherever possible, costly disruptions.

This premium gas disconnection service more than halves the standard industry waiting times of 8 - 10 weeks to as little as 4 weeks from initial order, leaving the site safe for demolition, redevelopment or other building work to take place without financial penalty.

If you'd like to take advantage of our fast gas disconnections, simply ask one of our advisors when you contact us.

 

Take a look at our case study on Fulham Palace and Bishops Park.

 

*Royal Society for the Prevention of Accidents