2012 Olympic Stadium & Park

2012 Olympic Stadium & Park

Fulcrum designed and installed some of the Games’ most critical gas infrastructure serving the Olympic Park, Athletes’ Village and the jewel in the crown, the Olympic Cauldron. Read more >>


Lincoln & York Ltd

Lincoln & York Ltd

Fulcrum was asked to assist in the fuel conversion of a food factory, from liquefied petroleum gas (LPG) to natural gas. The conversion would reduce the carbon emissions by 79 tonnes per year and deliver cost savings on fuel. Read more >>


News

New CEO takes the reigns at Fulcrum

Martin Harrison, Fulcrum’s Chief Financial Officer, has officially become the Chief Executive Office… Read more >>

All outlet pipework installations are designed and installed in accordance with gas safety legislation and are constructed by Gas Safe registered engineers.

Share

Twitter LinkedIn Google Plus Email Print

Outlet Pipework

We specialise in the design and installation of commercial outlet pipework and can design and construct either above ground, steel pipework installations or underground MDPE (plastic) outlet pipework if a boundary meter is required.

Minimising onsite disruption or delays is vital in order to complete your project successfully. Choosing Fulcrum to deliver all elements of your new gas infrastructure ensures everything will be done on time and on budget without cutting corners when it comes to safety. We will plan and execute new connections together with meter installations, outlet pipework and purging and relighting to accelerate project completion - saving you time in specifying requirements and coordinating installation across multiple suppliers.

All outlet pipework installations are designed and installed in accordance with gas safety legislation and are constructed by Gas Safe registered engineers.

Above ground, steel outlet pipework installations

Our welded steel outlet pipework installations are designed and constructed considering the layout of the property, ensuring safety compliance whilst delivering the most practical, aesthetic and cost effective solution to meet your specific needs.

Below ground MDPE (plastic) outlet pipework installations

Usually, connecting your boundary meter to your appliances will require underground MDPE (plastic) outlet pipework installation. In many instances a boundary meter requirement is mandated by the incumbent gas Network Owner, and therefore generally not incorporated into your initial specification and planning. With this knowledge it is advantageous to coordinate the design and installation of this outlet pipework alongside your inlet to maximise time and cost efficiencies and minimise disruption.

Outlet inspection and maintenance services

Gas mains and service infrastructure is owned and maintained by the gas network owner, however the upkeep of the outlet pipework becomes the responsibility of the property’s owners following installation. Poorly maintained outlet can lead to disruptions of service, but more importantly significant safety risks and threats to loss of life in the worst cases.

IGEM (Institute of Gas Engineering Managers) UP/2 (Inspection & Maintenance) standard states that businesses should have a full maintenance plan drawn up for all downstream outlet pipework and that it should be supported by an annual inspection to ensure it is correctly maintained. Fulcrum can provide a free inspection "M.O.T." of your outlet pipework and provide you with a report of our findings along with any recommendations for remedial actions if required. Read more about Inspection and Maintenance services.

Design and construction of 5m of gas outlet pipework between the meter / governor kiosk and the building.

Clyde Pumps

Clyde R1086

Clyde Union Pumps required a supplier who could provide a complete connection service for the installation of new gas fired steam generators which were to be used for testing their range of TWL pumps. In addition to design and constructing the incoming gas supply, we completed the gas meter fit, including installation of the kiosk and concrete base, along with the design and construction of 5m of gas outlet pipework between the meter / governor kiosk and the building.  Read more.

Over 82m of MDPE outlet pipework was installed as part of an end-to-end gas installation.

Lincoln & York

Lincoln R1049

Over 82m of MDPE outlet pipework was installed as part of an end-to-end gas installation - required to convert the food factory from liquefied petroleum gas (LPG) to natural gas. The new gas infrastructure enabled the business to cut energy costs and reduce the carbon emissions by 79 tonnes per year. Read more.