Ecotricity required Fulcrum Group Company, Dunamis to carry out the design, construction, and ongoing maintenance for a 132/33 kV substation connection supplying 9.5 MVA for Galsworthy Wind Farm.
substation connection
Maintenance solution
Fulcrum Group company, Dunamis, installed approximately 7.7km of private 33kV cabling and a fibre network to connect four wind turbines at Galsworthy Windfarm. This included the design and construction of a 132/33kV substation connection, supplying 9.5 MVA.
Dunamis used in-group expertise to provide a full design, the construction and then ongoing maintenance of the infrastructure once energised.
Galsworthy wind park has a capacity of just over 9MW and will generate over 22 million units of green electricity every year. That’s a fantastic contribution to Devon’s renewable credentials and will save around 10,000 tonnes of CO2 being pumped into the atmosphere.