I&C and Mixed Use Developments

Powering more energy efficient production for Premier Foods

Fulcrum worked with Premier Foods to deliver a significant utility project to improve productivity and reduce their carbon footprint.

  • Gas connections
  • Multi-utility connections

A community conscious delivery from a dedicated project team

0 KM

pipeline designed and installed

Significant reduction

In carbon footprint

Client Premier Foods
Location Lifton
Benefits delivered
  • Project completed by a dedicated team of project managers and engineers
  • Specialist engineering equipment utilised to overcome challenging terrain including successfully crossing the River Tamar
  • Fulcrum worked closely with the local community by holding regular meetings and publishing online updates through a dedicated website to keep residents informed of progress

Gas infrastructure that is powering better production of Ambrosia Custard

True added value project delivery.

Fulcrum designed and installed 12km of new gas infrastructure which enabled Premier Foods to reduce its carbon footprint in the production of its famous Ambrosia custard, by cutting its reliance on fuel oil and the number of road tankers used to deliver the fuel, as well as providing overall cost savings.

This was a significantly challenging project, successfully completed by a dedicated team of gas experts, project managers and engineers.

Following the installation, Fulcrum adopted the infrastructure and continue to own and operate the pipeline.

This is a major step forward for the site and the local community. We now have a cleaner and more sustainable energy source which is reducing our carbon footprint.

Premier Foods (Ambrosia Creamery)

Fulcrum can deliver the best utility connections solution for your next development.

Discover how our team of experts can provide the best connections service for your next project.

Get in touch today