Fulcrum was appointed to design and deliver a complex and bespoke gas infrastructure solution serving the development’s Combined Heat and Power (CHP) system. The project required a balance of technical excellence, safety, compliance, and architectural integration.
Medium Pressure main connected to existing gas network
of welded steel pipeline installed and located internally in the building
Fulcrum designed and installed a 400mm Medium Pressure (MP) gas main, connected to the existing gas network.
The system feeds a below-ground Pressure Reduction Installation (PRI), which supplies approximately 600 metres of steel pipework serving key areas of the site.
We were thrilled to be selected to design and build the complex gas infrastructure for this landmark redevelopment. Our unmatched expertise and experience in gas was key to ensuring a robust and complaint gas system was built and installed, whilst we worked tirelessly to meet the various complexities and aesthetic vision of the development.
We are proud to have played such a pivotal part in an historic redevelopment like Battersea.
Discover how our team of experts can provide the best connections service for your next project.