Fulcrum was appointed to design and install a 3km pipeline to supply gas to a significant, new Center Parcs holiday village - Woburn Forest in Bedfordshire.

Our solution

  • We designed and built the gas infrastructure to power an energy centre that includes combined heat and power units (CHP) and a central biomass boiler, to provide energy for an indoor pool, leisure facilities, 625 lodges, a luxury hotel, self-contained spa suites and retail outlets.

Benefits delivered

  • We worked closely with the building services design company and civil and structural engineers throughout the project to ensure that the installation was coordinated with the site’s development and wider schedule.

​​​​

Protection of the environment has always been a fundamental guiding principle for Center Parcs, and Woburn Forest will be no exception. Center Parcs has a sustainability strategy in place which has been agreed by the local authority and as such, Fulcrum will be providing us with a safe, natural gas connection to support Woburn Forest.

We are delighted the grid substation has been delivered on programme, it is now commissioned and formally adopted. This is a key piece of infrastructure for Fairham and will provide power for both housing and employment.

 

back to all stories
Request call back or quote

Apply for a quote

Applying for a quote is quick and easy. If you need help or want to speak to our team, we're here. Call us on 03330 146 466.

Complete full form

Request a call back

Simply provide your details, and one of our team will call you back.

Complete full form

close

©2023 Fulcrum Utility Services Limited