Customer requirements

Fulcrum was appointed to design and install a 3km pipeline to supply gas to a significant, new Center Parcs holiday village - Woburn Forest in Bedfordshire.

We designed and built the gas infrastructure to power an energy centre that includes combined heat and power units (CHP) and a central biomass boiler, to provide energy for an indoor pool, leisure facilities, 625 lodges, a luxury hotel, self-contained spa suites and retail outlets.

We worked closely with the building services design company and civil and structural engineers throughout the project to ensure that the installation was coordinated with the site’s development and wider schedule. 

 

Protection of the environment has always been a fundamental guiding principle for Center Parcs, and Woburn Forest will be no exception. Center Parcs has a sustainability strategy in place which has been agreed by the local authority and as such, Fulcrum will be providing us with a safe, natural gas connection to support Woburn Forest.

back to all stories
Request call back or quote

Apply for a quote

Applying for a quote is quick and easy. If you need help or want to speak to our team, we're here. Call us on 03330 146 466.

Complete full form

Request a call back

Simply provide your details, and one of our team will call you back.

Complete full form

close
NERS
GIRS
WIRS
LR LR
GIA
SAFE
SafeContractor
CHAS
Constructionline
ROSPA
UVDB
SSIP
MAMCoP
AMICoP
MOCOPA
SMICoP
NERS
GIRS
WIRS
LR LR
GIA
SAFE
SafeContractor
CHAS
Constructionline
ROSPA
UVDB
SSIP
MAMCoP
AMICoP
MOCOPA
SMICoP

©2021 Fulcrum Utility Services Limited